01
Lane length and number of firing points
25, 50 or 100 m, or lanes of different lengths in one building. Target retrieval systems run on lanes from 5 m, typically up to 500 m, and longer on request.
02
Rail routing
Panel rails above the lane, brackets and room for the Nucleus docking station at the end of the run. Nothing gets welded on site.
03
Power and network
230 V along the lane, a control cabinet and a network for the firing point tablets and the control room. Put them in the design from the start.
04
Control room and instructor position
A place from which the operator sees the whole facility and runs it from a tablet in RangeTech Master.
05
Lighting and simulation
RangeTech Light and RangeTech Surround need brackets behind the baffle and cabling. Even if they arrive in a later phase, prepare for them now.
06
Ventilation, signalling and access
RangeTech Master links the permission to fire with ventilation, signalling and access control. Those installations need a connection point to the system.